Call for Savings!
250-308-1888
Menu
On Saturday, October 15, 2022, Vernonites voted in favour of borrowing and constructing a new Active Living Centre that will include new swimming pools, gymnasium, fitness centre, and walking/running track. For more information provided by the City of Vernon, residents can learn more by going to the official website at https://www.engagevernon.ca/activelivingcentre.
Age of current facilities:
Population growth
The 50m pool will feature two movable bulkheads that can separate the pool into a variety of configurations (e.g., 2 x 25m sections or 3 sections of varying size, such as 12.5m, 12.5m, 25m). This would allow for the different areas to offer various types of aquatic programming at the same time(i.e., swim lessons, aquatic exercises, and lane swimming).
Because of the ability to offer multiple programs simultaneously, it’s anticipated that Learn to Swim program capacity would be able to increase.
A warm water leisure pool will have familiar features such as slides, interactive sprays, bubblers.
The warm water leisure pool area will also include an additional 25m lane section that could also be used for programs like preschool swim lessons.
Other play opportunities may include a rock-climbing wall, water walking mat, and rope swing, along with more dynamic portable amenities such as floating Wibit or Ninjacross course that can be used on a rotational basis.
The aquatic centre will not include permanent fixed amenities such as a wave pool or wave rider, which tend to lose public appeal after time and can be expensive to maintain. The focus instead is to include primarily portable play features that allow versatility for aquatic programming and hosting 25m and 50m swim competitions.
Double gymnasium with multiple sport courts and possible partition wall to create smaller, more versatile spaces.
A 150m walking/running track, which would be located above the gymnasium, would offer participants Vernon’s first indoor synthetic walking surface.
An 80-station fitness centre would feature cardio equipment, resistance machines and free weights, and dedicated multi-purpose program spaces that could accommodate various activities such as fitness classes, courses, and children’s programming.
The design and construction phases are outlined:
The final design phase beginning Spring 2023 is expected to take a full year to complete and will include additional public engagement to help determine design elements such as aquatic play features.
For more info on this new facility, please visit https://www.engagevernon.ca/activelivingcentre.
Interested in Buying or Selling Real Estate in Vernon? Contact Us and We’ll Get Back To You As Soon As Possible.
Copyright © Value Plus 3% Real Estate Inc 2024 | Legal | Sitemap Web Design by GetOn Marketing
"*" indicates required fields
"*" indicates required fields
We work to ensure your buying experience is tailored to your needs. From first time buyers to seasoned investors, our diverse and experienced team will help you navigate the process and find your dream home.
Fill in your details and we’ll get back to you in no time.
"*" indicates required fields